Client: Terna S.A.
Construction Period: 2004
Contractual Cost: 2.000.000 €
Manufacture, construction, erection and installation of the arched shelters at the entrances of the Olympic Stadium (O.A.K.A) and the area around it, designed by Santiago Calatrava.